Skip to content

Excavation and site work

Equipment, fuel, and phased work drive the cost of heavy civil and site work. We help connect telematics, field reports, and accounting so equipment time and quantities reach job cost by phase.

Illustration of a graded site with an excavator, dump truck, and roller, while a surveyor checks levels with a tripod.
Illustration, not a client site

How the work runs

Equipment drives the cost

Cost sits in equipment hours, fuel, trucking, and quantities moved, spread across phases that can run for months. Tying each back to the right phase is what makes a job cost report worth bidding from.

Systems we often see

  • Equipment telematics
  • Fuel cards
  • Daily field reports
  • Accounting and job cost

Where the work gets stuck

  • 01

    Crews and equipment across phases

    Scheduling machines and operators on multi-phase projects without a current view of availability.

  • 02

    Fuel, parts, and consumables

    Loosely tracked across jobsites, so overruns and delays surface late.

  • 03

    Field reports that feed billing

    Equipment hours, quantities, and progress by phase are needed for compliance and billing.

  • 04

    Profit known weeks later

    Separate production and accounting systems, and uneven cost codes, delay the answer.

One handoff, step by step

Fig. 03 · One handoffIllustrative example

Can equipment time be traced to the work phase it supported?

  1. Step 1, Telematics, in Equipment telematics: Records engine hours for the excavator.
  2. Step 2, Foreman, in Daily field report: Assigns those hours to a phase and cost code on the daily report. Re-keyed by hand from the previous system.
  3. Step 3, Project manager, in Job cost reports: Checks hours against quantities moved in that phase. Then a check: Hours line up with quantities moved? If not, the foreman corrects the phase.
  4. Step 4, Accounting, in Accounting: Posts equipment cost to the phase. Re-keyed by hand from the previous system.
  5. Ends with: Cost posted to the phase.
Without the phase, the hours land in overhead, and the next bid starts from a guess.

A typical sequence to show the kind of handoff we map. Not a client finding.

Recognize this handoff?

Walk us through one of yours.

Get started

Talk through your operations

Bring a job where equipment cost is hard to pin down. We'll talk through how to trace it.